Yiwu shuangfeng Waste Incineration power Co., Ltd. Project

Construction time:2005年(nián) locations:yiwu zhengjiang province
Construction scale of the project is two 65t/h+two 40t/h circulating fluidized bed garbage incinerators and two 12000kw steam bleeding and condensing steam turbine generator units, which is private station project of the enterprise, with daily garbage disposal capacity of 1200t. It was completed in November 2005.

Related news:
Last one:
Next article:
网站地图 一起草 www.17c.com-17C.COM一起草入口-17c.一起草 在线观看免费-www.17c一起草官网